DVM GROUP · OPERATIONAL SAFETY

RAMS & RISK MANAGEMENT

Structured risk assessment, safe systems of work and task-specific method statements supporting DVM operations across logistics, warehousing, installations and urban mobility.

Operational framework · DVM Group

PLAN BEFORE WORK BEGINS

IDENTIFY. ASSESS. CONTROL.

DVM uses risk assessment and method statement processes to identify foreseeable hazards, define appropriate controls and communicate safe working arrangements before relevant operations begin.

FRAMEWORK PLAN · CONTROL · REVIEW
DOCUMENT Risk Assessment

Hazards, people at risk and controls

DOCUMENT Method Statement

Safe sequence and working method

DELIVERY Site / Task Specific

Proportionate to the operation

CONTROL Review & Briefing

Updated when circumstances change

01. WHAT RAMS MEANS

RAMS is commonly used to describe Risk Assessments and Method Statements. Together, these documents can help define the risks associated with an activity and explain how the work is intended to be carried out safely.

DVM does not treat RAMS as a generic certificate or a one-document solution for every operation. The level of detail should remain proportionate to the task, environment, equipment, people involved and risks identified.

RISK ASSESSMENT What could cause harm?

Identifies hazards, considers who may be affected, evaluates risk and defines appropriate control measures.

METHOD STATEMENT How will the work be done safely?

Describes the planned sequence of work, responsibilities, equipment and safety precautions relevant to the operation.

02. DVM RISK MANAGEMENT PROCESS

DVM uses a structured approach to help ensure risks are considered before work starts and reviewed when operating conditions change.

01 IDENTIFY

Identify hazards associated with the task, equipment, environment and planned activity.

02 ASSESS

Consider who may be affected and the likelihood and potential severity of harm.

03 CONTROL

Select appropriate measures to eliminate or reduce identified risks.

04 COMMUNICATE

Brief relevant personnel on the planned controls and safe working method.

05 REVIEW

Review arrangements when circumstances, equipment or the scope of work changes.

03. OPERATIONS WITHIN THE RAMS FRAMEWORK

Risk management requirements vary according to the DVM activity being undertaken.

01
Warehouse Operations

Loading, unloading, storage, racking, vehicle movements, pedestrian controls and warehouse handling activities.

02
Installations & Relocations

Commercial furniture installation, reconfiguration, removals and workplace relocation activities.

03
Transport & Handling

Vehicle loading, unloading, load restraint, manual handling and movement of commercial equipment.

04
Mobility Operations

Battery swaps, collections, bike movement, deployment and associated urban operational activities.

04. RISK ASSESSMENT

A risk assessment should identify significant foreseeable hazards associated with the planned activity and determine appropriate measures to control the risks.

HAZARDS

What has the potential to cause harm?

PEOPLE

Who may be affected and in what way?

EXISTING CONTROLS

What safeguards are already in place?

FURTHER CONTROLS

What additional measures are reasonably required?

RESPONSIBILITY

Who is responsible for implementing each action?

REVIEW

When should the assessment be reconsidered?

05. METHOD STATEMENTS

Where appropriate to the work, a method statement can be used to communicate the planned safe system and logical sequence in which an operation is to be completed.

BEFORE Preparation

Access, personnel, equipment, site conditions, permits and pre-start requirements.

DURING Safe Sequence

Planned stages of work and controls that should remain in place throughout the task.

AFTER Completion

Close-down, housekeeping, inspection, handover and removal of temporary controls.

06. SITE & TASK-SPECIFIC INFORMATION

Effective RAMS depend on accurate information about the work and the environment in which it will take place.

Clients and operational partners should provide relevant information in sufficient time for DVM to consider foreseeable hazards and prepare appropriate arrangements where required.

SITE ACCESS

Vehicle access, loading areas, entrances and restrictions.

PEDESTRIANS

Public areas, employees, visitors and segregation requirements.

LIFTS & ROUTES

Lift availability, corridors, stairs and material routes.

SITE RULES

Inductions, permits, security and client procedures.

KNOWN HAZARDS

Asbestos information, fragile areas and other identified risks.

EMERGENCIES

Fire arrangements, evacuation procedures and emergency contacts.

07. DYNAMIC RISK ASSESSMENT & CHANGE CONTROL

Conditions encountered during an operation may differ from those originally planned.

Personnel should remain alert to significant changes that may affect the safety of the agreed work, including unexpected access restrictions, damaged equipment, changing traffic conditions, additional work activities or previously unidentified hazards.

!
CONDITIONS HAVE CHANGED

Work should not simply continue where a significant uncontrolled risk has arisen. The activity should be reassessed and the relevant controls or method updated before proceeding where necessary.

08. COMMUNICATION & TOOLBOX TALKS

Safe working arrangements are only effective when the people carrying out the task understand the relevant hazards, controls and responsibilities.

PRE-START BRIEFING

Relevant RAMS and operational controls communicated before work.

TOOLBOX TALKS

Focused safety communication relating to relevant work activities.

SITE INDUCTION

Client and site-specific rules understood where required.

FEEDBACK

Personnel encouraged to identify concerns and changing conditions.

09. COMPETENCE, EQUIPMENT & PPE

Risk controls may depend on appropriate competence, suitable equipment and task-specific personal protective equipment.

COMPETENCE

Suitable knowledge, experience, training or supervision for the activity.

EQUIPMENT

Suitable equipment selected and maintained for its intended operational purpose.

PPE

PPE selected according to identified risk and the nature of the task.

INSPECTION

Relevant pre-use checks, inspections and records completed where required.

10. MOBILITY & BATTERY OPERATIONS

Mobility activities can introduce additional risks associated with urban vehicle operations, loading, manual handling and the movement of lithium-ion battery equipment.

Relevant RAMS may therefore address battery handling, loading and restraint, roadside activity, operational vehicles, damaged equipment, incident escalation and emergency arrangements.

BATTERY Handling

Manual handling, inspection and safe movement.

VEHICLE Transport

Loading arrangements and appropriate load restraint.

URBAN Working Environment

Traffic, pedestrians, cyclists and roadside conditions.

INCIDENT Escalation

Damaged equipment and abnormal conditions reported promptly.

Detailed battery handling and lithium-ion safety information is addressed separately within the DVM Battery Safety & Handling framework.

11. INCIDENTS, NEAR MISSES & REVIEW

Accidents, near misses, unsafe conditions and relevant operational observations may provide information that should be considered when reviewing risk controls.

Where an incident indicates that an existing control or working method is no longer appropriate, relevant assessments and procedures should be reviewed before similar work continues where necessary.

12. DOCUMENT CONTROL

Where formal RAMS documentation is produced, document control helps ensure that the relevant version is identifiable and available to the people who need it.

REFERENCE Document ID

Defined document or project reference.

REVISION Version Control

Revision status and date of issue.

APPROVAL Responsible Review

Appropriate preparation and review arrangements.

COMMUNICATION Current Version

Relevant version available to affected personnel.

13. LEGAL & SAFETY FRAMEWORK

Depending on the activity and DVM's role within the work, risk management arrangements may interact with applicable UK health and safety legislation and guidance.

Health and Safety at Work etc. Act 1974 Management of Health and Safety at Work Regulations 1999 Manual Handling Operations Regulations 1992 Provision and Use of Work Equipment Regulations 1998 Lifting Operations and Lifting Equipment Regulations 1998 Control of Substances Hazardous to Health Regulations 2002 Work at Height Regulations 2005 Construction (Design and Management) Regulations 2015 where applicable
i
PROJECT-SPECIFIC DOCUMENTATION

This webpage describes the DVM RAMS and risk management framework. It is not itself a project-specific risk assessment or method statement. Where RAMS are required for a particular project or operation, documentation should reflect the actual scope, site conditions and identified risks.

PROJECT DOCUMENTATION

NEED RAMS FOR A DVM PROJECT?

Clients and operational partners can contact DVM regarding project-specific risk assessments, method statements and supporting Health & Safety documentation.

DVM GROUP

SAFETY DOCUMENTATION QUESTION?

Contact DVM Group regarding RAMS, site requirements, operational controls or project Health & Safety documentation.