Health & Safety
Zero harm is our goal. Every project is planned, risk-assessed and supervised so people, assets and buildings stay safe — on schedule and on budget.
Our commitment
- Full compliance with UK H&S law and client site rules
- RAMS issued before works; dynamic risk assessments
- Supervisors on site; audits, toolbox talks, near-miss reporting
Competence & training
- CSCS
- SSSTS/SMSTS
- First Aid
- Manual Handling
- UKATA Asbestos Awareness
- Fire Warden
- IPAF
- PASMA
Live training matrix per operative; inductions & toolbox talks.
Planning & RAMS
- Site surveys; access routes & protection of finishes
- Manual handling strategy & mechanical aids
- Work at height, fragile materials & edge protection
- Out-of-hours working; emergency arrangements
Equipment & inspections
- Handling kit with LOLER/PUWER checks
- PAT-tested electrical tools
- Standard & task-specific PPE
- Floor/lift protection, dust control, housekeeping
On-site controls
- Induction, permits, start-of-shift toolbox talk
- Exclusion zones, barricades, clear signage & walkways
- COSHH controls & SDS available
- Clean-as-you-go; daily close-down and sign-off
Vehicles & warehouse
- Daily vehicle checks, load restraint, banksman
- Safe loading for oversized/high-value items
- FLT/pedestrian segregation, racking inspections
- Fire safety & housekeeping in warehouse
Environment & waste
- Segregation; reuse/donation to reduce landfill
- WEEE recycling where applicable
- Duty of Care docs & transfer notes retained
Insurance & documents
- Employers’ & Public Liability in place
- H&S Policy and RAMS available on request
- H&S contact: enquiries@dvmbulgar.com
We work to: HSWA 1974, Management Regs 1999, Manual Handling 1992, Work at Height 2005, LOLER 1998, PUWER 1998, COSHH 2002, RIDDOR 2013 and CDM 2015 (where applicable).