Health & Safety

Health & Safety

Zero harm is our goal. Every project is planned, risk-assessed and supervised so people, assets and buildings stay safe — on schedule and on budget.

Our commitment

  • Full compliance with UK H&S law and client site rules
  • RAMS issued before works; dynamic risk assessments
  • Supervisors on site; audits, toolbox talks, near-miss reporting

Competence & training

  • CSCS
  • SSSTS/SMSTS
  • First Aid
  • Manual Handling
  • UKATA Asbestos Awareness
  • Fire Warden
  • IPAF
  • PASMA

Live training matrix per operative; inductions & toolbox talks.

Planning & RAMS

  • Site surveys; access routes & protection of finishes
  • Manual handling strategy & mechanical aids
  • Work at height, fragile materials & edge protection
  • Out-of-hours working; emergency arrangements

Equipment & inspections

  • Handling kit with LOLER/PUWER checks
  • PAT-tested electrical tools
  • Standard & task-specific PPE
  • Floor/lift protection, dust control, housekeeping

On-site controls

  • Induction, permits, start-of-shift toolbox talk
  • Exclusion zones, barricades, clear signage & walkways
  • COSHH controls & SDS available
  • Clean-as-you-go; daily close-down and sign-off

Vehicles & warehouse

  • Daily vehicle checks, load restraint, banksman
  • Safe loading for oversized/high-value items
  • FLT/pedestrian segregation, racking inspections
  • Fire safety & housekeeping in warehouse

Environment & waste

  • Segregation; reuse/donation to reduce landfill
  • WEEE recycling where applicable
  • Duty of Care docs & transfer notes retained

Insurance & documents

  • Employers’ & Public Liability in place
  • H&S Policy and RAMS available on request
  • H&S contact: enquiries@dvmbulgar.com

We work to: HSWA 1974, Management Regs 1999, Manual Handling 1992, Work at Height 2005, LOLER 1998, PUWER 1998, COSHH 2002, RIDDOR 2013 and CDM 2015 (where applicable).

Scroll to Top